Library

Backup, HA, and DR on an Unsupported Power8 System

Updated August 15, 2026

Once a Power8 system is past IBM's end-of-support date, the calculus around backup and disaster recovery changes. IBM is no longer committed to supplying replacement parts on demand, which means an unrecoverable hardware failure becomes a real, not hypothetical, path to extended downtime. Backup and DR posture stops being a compliance checkbox and becomes the actual thing standing between a failure and a business-impacting outage.

What to verify first

Backup and DR checklist for unsupported Power8 systems

AreaWhat to Confirm
IBM i save strategyFull system saves (not just library-level saves) are current, and a save-and-restore has actually been tested, not just scheduled.
PowerHA / replication targetsAny HA or logical replication setup does not depend on a second unsupported Power8 system as its only failover target.
Offline backup copyAt least one verified backup path exists that does not assume the primary Power8 system will always be reachable to restore from.
Recovery time reality checkIf a core component fails and TPM sourcing takes days rather than hours, does your DR plan actually cover that gap?

Why this matters more for enterprise-tier models

If you are running an E850, E870, or E880, this is especially important: those systems typically consolidate multiple partitions and workloads onto shared hardware. A single unsupported hardware failure on a consolidation platform can take down every partition on the box at once, not just one workload.

None of this is a reason to panic ... it is a reason to verify, specifically, rather than assume. If your backup and DR posture genuinely holds up under these questions, a TPM-supported Power8 system can run safely for a defined bridge period. If it does not, that gap is worth closing before anything else on this site.

Sources

More From the Library